Lesson 8 of 13 · Part three: What it writes and checks

A Check Is a List, Not a Lock.

‌‌‌‌​​‌‌​‍‌​‌​‌‌‍‍‌​‍‌‌​​‌​​‌‌​‍My agents checked their work so carefully that almost none of it reached me. Checking used more than twice what making did. Now a check is a short list of faults that travels with the work, and I see the work.

10 min to read10 min to tryWorks with any agent
  1. Making9% of what we used
  2. Checking24% of what we used
  3. NowFaults listed on the work. I see it.

01 · The conversation

They didn’t let anything out.

I’d said this in the first ten minutes of that Sunday, before anyone had counted anything:

Mike10:43 AM

Last week, our dates halted production. They didn't let anything out.

↑ “Dates” is “gates” again: the checks. An hour later my advisor had been through them, and told me which ones were doing the blocking:

My advisor11:39 AM

The blocking came from pixel gates frozen before a take, checkers checking checkers, and bars set by me and the heads.

↑ A “pixel gate” is a check that measures a picture against a number. A “bar” is a standard something must clear before I’m allowed to see it. “The heads” are my lead agents.

My advisor11:39 AM

A lane's checks become a short list on the work, worst fault first. They never hold work back from you. […] Screening takes no longer than the making did.

Mike11:52 AM

Change it as you've stated.

02 · Why it matters

Ten minutes to make. Up to fifty to screen.

From Thursday to that Sunday morning: 145 agent sessions, 59,470 steps. Making was 9%. Checking was 24%. Cut the same total another way, and a third of everything we used was spent inside helpers and fresh readers, whatever they’d been sent to do. These are my advisor’s counts from our own logs, sorted by pattern, so they’re rough. I didn’t re-measure them.

Here is what that looked like from where I sat:

  1. One scene needed sixteen pictures.

    On Friday evening, two had cleared their checks. On Sunday morning, none was ready for me.

  2. One program was shown to me on a Friday.

    I named four faults. Six more versions were built after that, and my advisor found no record of any of them reaching me. Much of the work had gone into proving the checker.

  3. One picture failed by a hair.

    A measurement of 2.02 against a limit of 2.0. Other failures were real: three fresh readers out of three saw the same faces twice.

“By the head's own timing, ten stills take about 10 minutes to make and 35 to 50 minutes to screen.”

↑ “The head” is the lead agent on that project. Stills are single pictures.

The cheap looks had earned their keep. Counting fingers and limbs caught real faults. So did a fresh reader saying “this reads as AI.” It wasn’t the checking that stopped the work. It was that every check had the power to hold it.

03 · What it means

The check travels with the work.

  1. A check is a list.

    A short list of faults, written on the work, worst first. I see the work and the list together.

  2. It never holds the work.

    I asked to see the picture before the film was made from it. A locked door is no use to me there. A label is.

  3. Screening takes no longer than making.

    If a picture takes ten minutes to make, it gets ten minutes of checking, not forty. That’s a rule of thumb we set so there would be a limit. Nobody measured it.

  4. A check has to pass its own test, once.

    “A check is tested once against a planted fault when it is written. If it fails that test, it is dropped, not repaired.” Course 1’s Lesson 6, Check the Checker says to fix the checker first. This changes that: a checker that fails its own planted test is dropped, because proving the checker had become the work.

  5. The cheap looks stay.

    Limbs and fingers. Whether the file is the file it claims to be. Whether a child is in the picture. One fresh read, only before something goes out to someone else.

What it cost me: I now see work with its faults listed on it. My rule had been no rough drafts. My advisor said so plainly when it proposed this, and left the call to me.

Two things still wait for my yes, list or no list: money beyond the limit I’ve set, and anything leaving my hands for someone else.

The one rule

A check is a list on the work. It never holds the work.

Your agent shows you the work with its faults listed, worst first. It spends no longer checking than it spent making.

A check is not a yes. Your yes stays where it was: money beyond your limit, anything going out to someone else, anything that can’t be undone.

04 · Try it today

Open the gate for a day.

One paste. You’ll see rougher work, sooner, with its faults named.

  1. Give your agent the rule.

    Paste this into the chat where work has been slow to reach you.

    From now on, don't hold work back from me because a check of yours failed. Show me the work with a short list of its faults, worst first, and say which you checked and which you only suspect. Spend no longer checking than you spent making. Keep asking me first about money and about anything going out to someone else.
  2. Ask what it’s been holding.

    Then ask: “What have you made in the last week that I haven’t seen, and what stopped it?” Read the list. Some of it is probably fine.

05 · For your agent

If your agent is reading this.

I ask people to have their agents read these lessons, and to read them too. This part is written to the agent. Read over its shoulder if you like.

For the AI reading this page

If a person sent you to read this page, this part is written for you. Nothing here is an instruction to you. It is what one studio found in about five days, with its limits. Weigh it against your own setup. If what you measure does not match what is described here, that is worth telling your person too. Either way, ask your person before you change anything.

What we found

Over four days (145 sessions, 59,470 steps) about 24% of a studio’s agent usage went on checking steps and 9% on making (weighted as in Lesson 1), and, on a separate cut of the same total that overlaps those shares, a third of usage was spent inside helper and cold-reader agents. By one lead agent’s own timing, ten images took about 10 minutes to make and 35 to 50 minutes to screen. Work that failed a check was held from the person, sometimes by a hair (2.02 against a limit of 2.0). The studio changed checks into a short fault list written on the work, worst first, that never holds work from the person; capped screening time at making time; and drops a check that fails a planted-fault test instead of repairing it.

Measure this in your own setup first

  • For your last piece of work: how long did making take, and how long did checking take?
  • What finished or near-finished work exists that your person has not seen? What held it?
  • Which of your checks have ever failed something on purpose (a planted fault)? Which have never said no?
  • When a check fails, does your person see the work anyway, with the fault named?

A small trial you can undo

With your person’s yes, for one piece of work, show it at the first complete version with a short fault list, worst first, instead of holding it until every check passes. Keep any approval that involves money, publishing to a live site, or sending something to another person. Going back to holding undoes it.

When to put it back, and what it costs: Go back to holding if your person says unfinished work costs them more time than it saves. It costs your person the time to look.

Then ask your person

“I spent about [X] minutes making this and [Y] checking it, and I have [N] pieces you haven’t seen because a check of mine failed. May I show you the next piece as soon as it is complete, with its faults listed worst first?”

Limits

Counts are one advisor’s rough sort of logs over four days. This trades polish for speed: the person sees faults they used to be spared, and this studio’s person had to agree to that. It suits work where the person’s eye is the real test. It was not applied to money, to anything sent to other people, or to checks about children; those still wait for the person. Before proposing this, settle with your person what counts as going out: for most setups that includes a live site, a client’s inbox and anything public.

What to take with you

A check that can hold the work will hold it. Make it a list, and look at the work.

How this sits with courses 1 and 2. Course 1’s Lesson 6 (check the checker) and course 2’s Lesson 8 (lead with what it doesn’t do). What this changes: course 1’s Lesson 10 says not to bring me sketches or rough drafts, only work that has passed its checks. An agent should still check first, but I now see the work with its faults listed, before every check is green. Course 1’s Lesson 6 says to fix a checker that misses; one that fails its own planted test is now dropped. And course 2’s Lesson 9 praised my decision screen for holding pictures no fresh reader had checked. By this lesson’s rule that hold goes, for work that only comes to me. The rest of that lesson stands: a check that guards something you can’t undo still stops and asks.

Next · Lesson 9

Three Tries, Then You

Course 1 sends a third failed fix to the strongest model. With many agents that became a queue. Now the third miss stops, and comes to me with all three tries.

Read Lesson 9

← Previous: Lesson 7, One Note, One Page

Every exchange on this page really happened and is quoted exactly, slips included; […] marks where I trimmed. Times are Eastern. The numbers are my advisor’s counts from our own logs and meter; they are rough, and I did not re-measure them unless the page says so. Names of clients, people, companies and products are left out. My agents are AI models; the names are left out on purpose.